Concrete pad installation for metal storage building
Install Concrete Pad for Metal Storage Building at Fire Station #63, Solicitation FIRE-0302, issued by City of Santa Cruz.
The job
City of Santa Cruz Fire is soliciting bids to install a concrete pad and utilities for a metal storage building at Fire Station #63. Work includes demolition, utility trenching, concrete pad installation rated for 55,000-lb fire apparatus, and stormwater management; project budget is capped at $200,000 with bids due November 19, 2026.
- Issuing agency
- City of Santa Cruz
- Solicitation number
- FIRE-0302
- Portal id
- 316038
- Type
- purchase
- Posted
- Oct 30, 2026
- Response deadline
- Nov 19, 2026, 5:00 PM EST
- Pre-bid meeting
- Nov 10, 2026, 1:30 PM EST
- Questions due
- Nov 13, 2026, 8:00 PM EST
- Answers posted
- Nov 17, 2026, 9:00 PM EST
- Place of performance
- Santa Cruz County, CA
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #FIRE-0302. Issued by Fire. Install a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Bidders shall be aware that electrical, above-ground fire sprinkler & building installer vendors have been selected. The following is the scope of work needed: Demolition (saw cut and removal of existing AC material) Utilities (trenching for electrical and fire sprinklers, electrical pipe installation) Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation) Remove existing storm drain inlet connection and install/connect new Bio-Retention Area.
Bidders shall review and adhere to the following: Green Building Checklist Site management & bmps per plans Construction waste reduction, disposal and recycling Product gwp compliance Finish material pollutant control
Coordinate and work with other contractors as required to execute all work listed on plans. Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors. All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan. All work must comply with the building permit plans, as well as state and local codes. A bid bond is required for the project bid. A labor and performance bond and a materials bond will be required after the project is rewarded. The total project budget shall not exceed $200,000. Bidders shall submit bids that are within this maximum amount.
Open bids like this one
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.