OpenResponses due Oct 14, 2026, 6:00 PM EDT

Structural concrete work for airport transformer upgrade

Trade Package - Airport Substation Transformer Upgrade Project - TP 10 - Structural Concrete, Solicitation 307240, issued by San Francisco County.

At a glance

San Francisco International Airport is seeking a structural concrete contractor for transformer oil containment pads, switchgear pads, and control enclosure pads as part of a major substation upgrade project. Work must maintain 24/7 airport operations and comply with endangered species protection requirements. Bids due October 14, 2026.

Key facts

Issuing agency
San Francisco County
Solicitation number
307240
Type
purchase
Posted
Sep 24, 2026
Response deadline
Oct 14, 2026, 6:00 PM EDT
Place of performance
San Francisco County, CA
Official posting
Documents, addenda and the procurement contact, free with an account.
  • structural concrete
  • pads and foundations
  • utility infrastructure
  • airport construction
  • heavy civil

Respond to this bid

This solicitation is administered by the issuing agency through its OpenGov procurement portal. The official documents, any addenda and updates, and the procurement officer’s contact information are all posted there, and bid submission happens there, not on SledAtlas.

The direct link to the source posting (documents, addenda, updates, and the procurement contact) is free with a SledAtlas account. Sign in or create a free account.

Official description

Solicitation #11887.67 - TP 10. Issued by Design-Builder. Design-Builder Firm Name: Webcor Project Overview: The Airport Substation Transformer Upgrade Project (Project) will replace the two existing Airport Substation transformers with three new 55-MVA transformers (one will serve as a backup), the existing switchgear equipment, and other supporting electrical systems. This contract will increase capacity and improve power supply reliability and redundancy for power supply scenarios outside of normal perations. The Project is one of the two substations that provides power to the Airport, which is a campus operational twenty-four (24) hours a day throughout the year. The Airport shall remain operational at all times during the project's implementation. The Project is also located on the West of Bayshore (WOB) property owned by the Airport. The WOB property contains major utilities, water pump stations, and a biologically sensitive habitat that supports endangered species. The Airport is implementing a long-term Recovery Action Plan for the San Francisco garter snake. Services will need to be implemented in phases, and all the requirements to ensure no disruption to Airport Operations and avoid and minimize impacts to the WOB San Francisco Garter Snake Recovery Action Plan during construction should be applied. Trade Package No.: TP-10 Trade Package Title: Structural Concrete Description of the Trade Package Scope of Work: Structural concrete for transformer oil containment and pads, switchgear pads, and control enclosure pads.

Trade Package Bid Due Date and Time: RFQ APPLICATION DEADLINE Wednesday October 14, 2026, at 3:00 PM

Main Trades of the Trade Package: Structural Concrete Estimated Cost: $1.9M CMD LBE Participation Requirement: 100% Design-Builder requirements or prequalification criteria: Please see Webcor prequalification requirements in the Design Builder Weblink below. Contact for Trade Package information: Leila Lilazi; Email: (on the official posting) Design-Builder web link to the Trade Package or more information: https://app.buildingconnected.com/opportunities/6ab5dc88c1d44533bb98a39b/info

Don’t miss the next one

Save this bid and SledAtlas keeps its deadline for you. Save a search for structural concrete from the card on the left and the next one lands in your inbox on the day it posts.

What happens when you save this bid

  • It goes on your calendar. The response deadline land on your SledAtlas calendar and in your own calendar app through your private feed.
  • You get reminded. One email on each of the days you choose before the deadline (your account default applies until you change it for this bid), and a line on your calendar card until you dismiss it.
  • You hear about changes. If the deadline moves, a pre-bid meeting is added or the status changes, it is in your next daily email.
  • Your notes and documents live on the job. Private to you, on the bid’s own page under My bids.

Create a free account and come straight back to this bid. No card, no password; a sign-in code by email or one click with Google.

Why this bid is on SledAtlas

We read every California source we have, and federal work performed in California, several times a day, give every listing a plain-English title and summary, and check every deadline daily. What you see is what the portals show, in one search, with the direct link to the official posting when you are ready to respond. Search is free, no card.