EV charger installation at municipal corporation yard
EV CHARGER PROJECT AT THE CITY CORPORATION YARD (CIP2515), Solicitation 260540, issued by City of Monterey.
What this job went for
IntelligenceThis solicitation has been awarded; the portal names the awardee on the official posting.
Bid results · 5 bidders
Every bidder and price, the low bid and the spread:
The job
City of Monterey Public Works is procuring and installing 3 dual Level 2 and 1 dual Level 3 EV chargers at the city corporation yard. Work includes site prep (demolition, trenching), electrical infrastructure (conduits, wiring, switchboard, transformer, panel board), concrete pads, bollards, and operational testing per PG&E requirements.
- Trade
- Solar and EV charging
- Also includes
- Electrical and lighting
- Kind of work
- EV charging stations installation
- The work
- New construction or installation
- Contract
- One job
- Who can bid
- Any qualified firm.
- Issuing agency
- City of Monterey
- Solicitation number
- 260540
- Type
- purchase
- Posted
- Apr 29, 2026
- Response deadline
- Jun 2, 2026, 5:00 PM EDT
- Pre-bid meeting
- May 14, 2026, 1:00 PM EDT
- Questions due
- May 21, 2026, 5:00 PM EDT
- Answers posted
- May 28, 2026, 5:00 PM EDT
- Award expected
- Jul 21, 2026, 3:00 AM EDT
- Place of performance
- Monterey County, CA
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Issued by Public Works. In general, the work consists of, but is not limited to, procuring and installing the 3 dual level 2 (Autel MaxiCharger) and 1 dual level 3 (BTC Power Gen4) EV chargers. Including any required demolition, trench excavation, trench restoration, installation of conduits, wiring, and connections in accordance with the contract documents, manufacturer recommendations, and PG&E requirements. The work also includes installation of any structural concrete or maintenance pads, bollards, and equipment labeling as required. This also includes the procurement and installation of the switchboard, transformer, and Panel board as approved by PG&E. Contractor shall also perform testing to demonstrate that the chargers are fully operational.
Open solar and ev bids in California
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
- OpenDue Nov 16, 2026
Other trades in California: ElectricalEnergy performanceRoofingPick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.