Arizona138 open bidspricing on 3 of themUpdated daily, many sources several times a dayArizona’s page

Saved searches

Recently viewed

…

OpenResponses due Dec 18, 2026, 4:00 PM EST

Silverbell Road roadway improvements construction

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road, Solicitation 270146, issued by City of Tucson.

See 15 similar jobs and what they went for
15 unit prices · 15 similar jobs

What this job goes for

Intelligence

Arizona road construction bid results, every bidder’s price, Mar 2025 to Oct 2026.

Unit prices for this job’s items

15 items of road construction work bid in Arizona, last 2 years
  • Subgrade Preparation · per sq ydBids usually run (the middle of 8 jobs). Most fall between and .
  • Project Earthwork (Cut) · per cu ydBids usually run (the middle of 4 jobs). Most fall between and .
  • Contract Allowance · per allBids usually run (the middle of 4 jobs). Most fall between and .
  • Unclassified Excavation · per cu ydBids usually run (the middle of 4 jobs). Most fall between and .
  • REMOVE AND DISPOSE OF EXISTING GUARDRAIL · per lin ftBids usually run (the middle of 4 jobs). Most fall between and .
  • Clear and Grub · per acreBids usually run (the middle of 3 jobs). Most fall between and .
  • Remove Sidewalk · per sq ftBids usually run (the middle of 3 jobs). Most fall between and .
  • Roadway Excavation · per cu ydBids usually run (the middle of 3 jobs). Most fall between and .

And 7 more items.

The job

City of Tucson is soliciting bids for approximately 3.27 miles of roadway improvements on Silverbell Road and connecting segments, including four-lane roadway with medians, sidewalks, multi-use path, traffic signals, lighting, landscaping, utilities, and drainage. Work spans from El Camino del Cerro to Goret Road. Bids due October 5, 2026.

Trade
Road and highway construction (not named as paving)
Also includes
Paving and asphalt; Concrete, sidewalk, curb; Traffic signals, guardrail, traffic control; Electrical and lighting; Storm drainage, culverts, erosion; Landscaping, mowing, grounds
Kind of work
roadway improvements with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping, irri
The work
New construction or installation
Contract
One job
Size
3.27 miles, as the posting states it
Who can bid
Any qualified firm.
Issuing agency
City of Tucson
Solicitation number
270146
Portal id
291524
Type
purchase
Posted
Aug 19, 2026
Response deadline
Dec 18, 2026, 4:00 PM EST
Pre-bid meeting
Aug 27, 2026, 4:00 PM EDT
Questions due
Sep 25, 2026, 3:00 PM EDT
Place of performance
Pima County, AZ

Official posting

Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).

Official description

Solicitation #270146. Issued by Transportation & Mobility. The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities.

Open road construction bids in Arizona

Other trades in Arizona: PavingConcreteTrafficPick another trade

On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.

Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.