Silverbell Road roadway improvements construction
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road, Solicitation 270146, issued by City of Tucson.
What this job goes for
IntelligenceArizona road construction bid results, every bidder’s price, Mar 2025 to Oct 2026.
Unit prices for this job’s items
- Subgrade Preparation · per sq ydBids usually run (the middle of 8 jobs). Most fall between and .
- Project Earthwork (Cut) · per cu ydBids usually run (the middle of 4 jobs). Most fall between and .
- Contract Allowance · per allBids usually run (the middle of 4 jobs). Most fall between and .
- Unclassified Excavation · per cu ydBids usually run (the middle of 4 jobs). Most fall between and .
- REMOVE AND DISPOSE OF EXISTING GUARDRAIL · per lin ftBids usually run (the middle of 4 jobs). Most fall between and .
- Clear and Grub · per acreBids usually run (the middle of 3 jobs). Most fall between and .
- Remove Sidewalk · per sq ftBids usually run (the middle of 3 jobs). Most fall between and .
- Roadway Excavation · per cu ydBids usually run (the middle of 3 jobs). Most fall between and .
And 7 more items.
The job
City of Tucson is soliciting bids for approximately 3.27 miles of roadway improvements on Silverbell Road and connecting segments, including four-lane roadway with medians, sidewalks, multi-use path, traffic signals, lighting, landscaping, utilities, and drainage. Work spans from El Camino del Cerro to Goret Road. Bids due October 5, 2026.
- Trade
- Road and highway construction (not named as paving)
- Also includes
- Paving and asphalt; Concrete, sidewalk, curb; Traffic signals, guardrail, traffic control; Electrical and lighting; Storm drainage, culverts, erosion; Landscaping, mowing, grounds
- Kind of work
- roadway improvements with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping, irri
- The work
- New construction or installation
- Contract
- One job
- Size
- 3.27 miles, as the posting states it
- Who can bid
- Any qualified firm.
- Issuing agency
- City of Tucson
- Solicitation number
- 270146
- Portal id
- 291524
- Type
- purchase
- Posted
- Aug 19, 2026
- Response deadline
- Dec 18, 2026, 4:00 PM EST
- Pre-bid meeting
- Aug 27, 2026, 4:00 PM EDT
- Questions due
- Sep 25, 2026, 3:00 PM EDT
- Place of performance
- Pima County, AZ
Official posting
Documents, addenda and how to respond are on the agency’s own posting. Open the official posting (free with an account).
Official description
Solicitation #270146. Issued by Transportation & Mobility. The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities.
Open road construction bids in Arizona
- OpenDue Dec 3, 2026
Other trades in Arizona: PavingConcreteTrafficPick another trade
On the free plan a trade inside a state is your one specific search of the day; a plan searches every trade, every place.
Saving puts the deadline on your calendar, reminds you before it and emails you if it moves.